7
Preparations
Site Preparations
Prior to installation of the Malibu/Sovereign
bathtub the floor and walls within the required
area must be finished.
See the instruction in the Site Preparation.
Actions Before the First Use (9 steps)
1 Make sure that the Malibu/Sovereign bathtub has
been installed according to the Assembly and
Installation Instructions.
2 Check that all parts of the product are supplied.
Compare to section Parts Designation on page 8.
If any part is missing or damaged - do NOT use
the product.
3 Read the IFU.
4 Perform a functionality test according to section
Perform functionality test: on page 45.
5 Clean and disinfect the product according to
section Cleaning and Disinfection Instructions on
page 35.
6 Choose a designated area, where the IFU should
be kept and is easily accessible at all times.
8 Make sure the thermostatic mixer has been
calibrated according to the Assembly and
Installation Instructions by an Arjo technician or
qualified personnel.
9 Make sure to have a rescue plan ready in case of
a patient emergency.
Actions Before Every Use (4 steps)
1 Check that all parts are in place. Compare to
section Parts Designation on page 8.
2 Check Malibu/Sovereign bathtub and
accessories for damage.
3 If any part is missing or damaged - do NOT use
the product.
Before every use, make sure the
Malibu/Sovereign bathtub is cleaned and
disinfected according to section Cleaning and
Disinfection Instructions on page 35
7
WARNING
To prevent scalding, make sure that the
thermostatic mixer has been calibrated.
Confirm that responsible organization has
established calibration routines.
4
WARNING
To prevent cross-contamination always
follow the disinfection instructions in this
IFU.
NOTE
If you have any questions, please contact
your local Arjo representative for support
and service. The contact information (Arjo
addresses) is listed on the last page of this
IFU.