Installation - DRV25
Before tting to the pipework, it is recommended
that connectors are tted to the inlets and outlet.
This will enable the DRV to be easily removed,
if required.
Flush pipework thoroughly
(minimum of 5 minutes).
Fit the DRV to the pipework.
Grounding is required, connect the power
cable to the primary power supply via switched
circuit breaker with a 3 Amp fuse or a 15 Amp
grounding-type receptacle (socket).
Do not t or replace a power cable plug!
Ensure the LED on the DRV goes through the
initial power up sequence.
Commission the DRV25 and recirculation
system using the following instructions...