1. Remove any wooden or other frame used for shipment.
2. Bring the cases close to each other, ensuring that the channel points line up
3. NOTE: BEFORE PROPER LEVELING ALL THE CASES THE HIGHEST POINT OF THE FLOOR
MUST BE DETERMINED AS THE STARTING POINT.
4. Level the case front to back and left to right using shims under each leg as necessary.
5. Apply silicone along the whole perimeter of the case.
6. Following the illustration above, and on the following page, insert the alignment pins as
the cases are bolted together.
14. Cabinet Multiplexing
8
Arneg USA - Lexington, NC
BILBAO & SUPER BILBAO
BILBAO & SUPER BILBAO