EasyManua.ls Logo

Artesian Spas Eagle Crest - Priming Pumps; Water Preparation

Artesian Spas Eagle Crest
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Priming Pumps
1. Turn off power at electrical service panel.
2. Locate and loosen the pump union by turning it counter-clockwise one half of
one turn.
3. Allow air to escape from the fitting. When a steady stream of water flows from the
pump union, close it by turning it clockwise until tight.
4. Turn on power at electrical service panel.
5. Perform one additional check to ensure water is flowing from the jets during the
auto purge cycle. If so, continue to Water Preparation. If no water flow is coming
from the spa jets, please contact Alpine Spas for further assistance.
Water Preparation
Proper understanding of the treatment of fresh water prior to use is an important part of
maintenance and is one of the key aspects enabling worry free usage. Failure to properly
prepare the water can result in substantially decreased life of the components and may void
the warranty in severe cases. Please consult Alpine Spas in regards to appropriate start-up
and maintenance kits available when purchasing the spa.
Salt Spa or Ultrazone
Your spa will be fitted with either an Ultrazone sanitizer or a brominator which converts salt
to bromine. Refer to the particular guides for either of these options.

Related product manuals