EasyManua.ls Logo

Ashford e-Spinner 3 User Manual

Ashford e-Spinner 3
6 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Ashford Guarantee
Thank you for purchasing this Ashford product. In the unlikely event there is
any fault in manufacture, please contact the dealer you purchased it from.
To validate the guarantee, please go to www.ashford.co.nz/product-registration
Ashford Handicrats Limited
415 West Street, Ashburton 7700, New Zealand
Telephone 64 3 308 9087
sales@ashford.co.nz www.ashford.co.nz
INSTRUCTIONS
ESP3-140423V6
e-Spinner 3

Other manuals for Ashford e-Spinner 3

Question and Answer IconNeed help?

Do you have a question about the Ashford e-Spinner 3 and is the answer not in the manual?

Ashford e-Spinner 3 Specifications

General IconGeneral
TypeElectric Spinning Wheel
Speed0-1800 RPM
MaterialWood and Metal
Power SourceAC Adapter
Included Accessories3 bobbins, lazy kate, carry bag
Orifice Diameter15 mm (0.6 in)
Speed RatiosVariable

Summary

e-Spinner 3 Assembly Instructions

Tools Required

List of essential tools needed for the e-Spinner 3 assembly process.

Initial Assembly Steps

First steps of assembly including yarn guides, brake band setup, and screw eye attachment.

Further Assembly and Lubrication

Oiling and Bobbin Mounting

Applying oil to the flyer spindle and mounting the bobbin onto it.

Connecting Flyer and Drive

Connecting the flyer to the flexible motor drive and lubricating the bearing.

Brake Band and Tensioning

Attaching the brake band, tension knob, and threading hook for proper tensioning.

Lazy Kate Assembly and Operation

Lazy Kate Assembly Steps

Instructions for assembling and setting up the lazy kate with bobbins.

Control Panel and Operation

Explanation of the control panel functions, speed, and ON/OFF switch.

Foot Switch Operation Modes

Details on using the foot switch for starting and stopping the e-Spinner 3.

Spinning and Plying Techniques

Spinning Process Guide

Step-by-step guide for preparing and starting the spinning process.

Changing the Bobbin

Procedure for safely changing the bobbin on the e-Spinner 3.

Lubrication Recommendations

Guidance on regular lubrication for optimal e-Spinner 3 performance.

Plying and Safety Precautions

Plying Yarn Instructions

Instructions for plying yarn using the e-Spinner 3 and lazy kate.

Orifice Reducer Bush Usage

Information on using the orifice reducer bush for finer yarns.

General Safety Precautions

Important safety guidelines for operating and maintaining the e-Spinner 3.

Related product manuals