EasyManua.ls Logo

Ashford JOY 2 User Manual

Ashford JOY 2
7 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTRUCTIONS
Ashford Guarantee
Thank you for purchasing this Ashford product. In the unlikely event there is
any fault in manufacture, please contact the dealer you purchased it from.
To validate the guarantee, please go to www.ashford.co.nz/product-registration
Ashford Handicrats Limited
415 West Street, Ashburton 7700, New Zealand
Telephone 64 3 308 9087
sales@ashford.co.nz www.ashford.co.nz
JOY 2 SPINNING WHEEL
SINGLE AND DOUBLE TREADLE WITH A SLIDING HOOK FLYER
JASW020424

Other manuals for Ashford JOY 2

Question and Answer IconNeed help?

Do you have a question about the Ashford JOY 2 and is the answer not in the manual?

Ashford JOY 2 Specifications

General IconGeneral
Weight5.5 kg (12 lbs)
MaterialBeech hardwood
FinishLacquered
Bobbin Capacity130g (4-5 oz)
DriveScotch tension
FoldingYes
Orifice Size1cm (⅜")
Wheel Diameter40 cm (15.75 in)

Summary

Assembly Instructions

Parts Identification

Lists all components of the spinning wheel for identification.

Tools Required

Lists the necessary tools for assembly and maintenance.

Step 1: Disengage Latch

Instructions for releasing the treadle board latch and securing it.

Step 2: Prepare Flyer Arms

Instructions for waxing flyer arms and attaching yarn guides.

Step 3: Brake Band Adjustment

Detailed steps for cutting and attaching the brake band.

Step 4: Attach Brake Band Spring

Instructions for threading the brake band spring into the frame.

Step 5: Install Bobbin and Flyer

Steps for oiling the spindle and attaching the bobbin and flyer.

Step 6: Install Tension Knob & Hook

Inserting tension knob and threading hook, adjusting springs.

Step 7: Store Spare Bobbins

Placing spare bobbins on front frame holders.

Step 8: Lubricate Bearings

Applying oil to flyer, bobbin, and conrod bearings.

Ratio and Folding

Drive Ratio Explanation

Explains how to position the drive cord for different ratios.

Folding the Spinning Wheel

Step-by-step instructions for folding the spinning wheel.

Carrying the Spinning Wheel

Guidance on how to safely carry the spinning wheel.

Getting Started with Spinning

Prepare Leader Yarn

Attaching a leader yarn to the bobbin and threading it.

Adjust Tension

Adjusting the brake band tension for optimal spinning.

Starting Technique

Advice on posture and initial treadling technique.

Spinning Singles and Plying

Instructions for joining fibres and plying yarns.

Maintenance and Resources

Replacing Drive Belt

Step-by-step guide to replacing a worn drive belt.

Additional Information

Links to videos, social media, and blog for further support.

Related product manuals