EasyManua.ls Logo

Ashford JOY 2 - Step 3: Brake Band Adjustment; Step 4: Attach Brake Band Spring; Step 5: Install Bobbin and Flyer

Ashford JOY 2
7 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
27cm (10¾in)
27cm (10¾in)
Apply a drop of oil to the
flyer spindle and slide the
bobbin on. Ashford spinning
oil is ideal for this purpose.
Thread the flyer spindle into
the top shat. Hold the flyer
whorl with one hand and
rotate the flyer clockwise
with the other. Tighten
firmly.
Cut 40cm (16in) o the brake
band. Tie one end to the
spring attached to the screw
eye and the other to the
second spring so that you
have 27cm (10¾in) between
the 2 springs (See side of
this page). Tie one end of
the surplus nylon to the
second spring, and thread
the other end through the
tension knob and tie a knot.
Trim o surplus nylon.
Wax, then thread the screw
eye with the brake band
spring attached into the
hole in the front frame.

Other manuals for Ashford JOY 2

Related product manuals