EasyManua.ls Logo

Aspect BIS VISTA - Preventive Maintenance; System Checkout

Aspect BIS VISTA
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 6 PREVENTIVE MAINTENANCE
_______________________________________________________________________
6-1
SECTION 6
6 PREVENTIVE MAINTENANCE
INTRODUCTION
The BIS VISTA system is designed so that no periodic adjustment or calibration is required.
Suggested routine maintenance covered in this section includes:
Periodic checking of cable integrity
System checkout
Checking the battery
Checking leakage current
Instructions on replacing cables, connectors, the battery, the power supply and the clamp
shoe are included in Section 8, “Servicing the BIS VISTA System” if replacement is
necessary. In the event that the touch screen needs calibration, follow the instructions in
Section 8.9, “Calibrating the Touch Screen.”
6.1 Physical Integrity Inspection
Periodically check the system (BIS VISTA monitor, BISx, PIC) for physical damage to cases
and associated cables and connectors.
1. Inspect the cases of the monitor and the BISx to ensure that plastic is not cracked or
broken.
2. Inspect the gasket seal around the case joining surfaces to insure the integrity of the
splash resistance seal.
3. Inspect the cables and strain relief mechanisms.
4. Inspect the connectors for damage, faulty strain relief or contamination.
6.2 System Checkout
A system checkout should be done periodically to verify that all system components are in
working order. To test the system from the BISx to the BIS sensor, you will need a Sensor
Simulator (Part Number 186-0137) or a Test Sensor (See Appendix I for more information).
Follow the instructions below for System Checkout.

Table of Contents