Installation & Servicing Instructions ATAG Q-Series
5
Installers are required to carry out installation, commissioning and servicing work in ac-
cordance with the Benchmark Code of Practice which is available from the Heating and
Hotwater Industry Council who manage and promote the Scheme.
Visit www.centralheating.co.uk for more information.
Ireland:
- Irish standard 813
- Domestic gas installations
The current, Electricity at Work Regulation must be complied with and also be in
accordance with the relevant and current editions of the British Standards.
The ATAG Q boiler is a certied appliance and must not be modied or installed in any
way contrary to this Installation Manual. Manufacturers instructions must not be taken
in any way as overriding statutory obligations.
The ATAG Q is a central heating unit with an optional integrated hot water function. These
units must be connected according to these instructions and all installation norms in
respect of the part of the unit to be connected.
The device may be operated only by authorized persons who have been instruc-
ted on the operation and use of the device. Improper use may cause damage to
the device and / or to the connected installation.
The appliance is not to be used by children or persons with reduced physical,
sensory or mental capabilities, or lack of experience and knowledge, unless
they have been given supervision or instructions.
Children being supervised are not to play with the appliance.
Observe the following rules of safety:
- All work on the unit must take place in a dry environment.
- ATAG units may never be in operation without their housing, except in connection
with maintenance or adjustments (see Chapter 13 and 14).
- Never allow electrical or electronic components to come into contact with water.
Carry out the following tasks in connection with maintenance, etc. to an already-installed
unit:
- Shut down all programmes
- Close the gas tap
- Remove the plug from the wall socket
- Close the stop cock of the unit’s intake connection
Take note of the following when maintenance or adjustments are needed:
- The unit must be able to function during these activities; for this reason, the unit’s
supply voltage, gas pressure and water pressure must be maintained. Ensure that
these is not a source of potential danger during these activities.
Following maintenance or other activities; always check the installation of all parts
through which gas ows using leak detection uid (LDF).
Following maintenance or other activities, always replace the housing and secure
it with the screw behind the door at the front of the casing.
The following (safety) symbols may be encountered in these installation instructions and
on the unit:
This symbol indicates that the unit must be stored away from frost.
This symbol indicates that the packaging and/or contents can be damaged as a
result of insufcient care taken during transport.

Other manuals for Atag Q 25S

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atag Q 25S and is the answer not in the manual?

Atag Q 25S Specifications

General IconGeneral
BrandAtag
ModelQ 25S
CategoryBoiler
LanguageEnglish

Related product manuals