EasyManua.ls Logo

ATEQ D620 - Starting up; Power up; Preparing a Program

ATEQ D620
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D620.388.00_QS_UK_01
34 / 42
Starting up
POWER UP
1. Make sure that all the necessary connections are
in place.
Electrical: such as power supply, inputs/outputs
Pneumatic: including line pressure supply.
2. Power up your device.
When power-up is completed, the Program screen is
displayed, with last program used on screen.
Pr 001
DIRECT FLOW
PREPARING A PROGRAM
Use this procedure to configure a new test program.
On the MAIN MENU screen:
ACCESSING THE PARAMETERS
1. Select PARAMETERS using the up/down
keys and then press .
MAIN MENU
SPE CYCLE
PARAMETERS
CONFIGURATION
SERVICE
RESULTS
USB
The program list is displayed.
Pr:01
Copy-Paste
Pr:02
Pr:03
Pr:04
Pr:05
Pr:06
Pr:07
PARAMETERS
SELECTING A PROGRAM NUMBER
2. Select the program to configure and press .
A list of the available measurement types is displayed:
DIRECT FLOW type
INDIRECT type
OPERATOR type
QUICK TEST type.
DIRECT FLOW
CO
INDIRECT
OPERATOR
QUICK TEST
PARAM/TYPE

Other manuals for ATEQ D620

Related product manuals