D620.388.00_QS_UK_01
34 / 42
Starting up
POWER UP
1. Make sure that all the necessary connections are
in place.
Electrical: such as power supply, inputs/outputs
Pneumatic: including line pressure supply.
2. Power up your device.
When power-up is completed, the Program screen is
displayed, with last program used on screen.
Pr 001
DIRECT FLOW
PREPARING A PROGRAM
Use this procedure to configure a new test program.
On the MAIN MENU screen:
ACCESSING THE PARAMETERS
1. Select PARAMETERS using the up/down
keys and then press .
MAIN MENU
SPE CYCLE
PARAMETERS
CONFIGURATION
SERVICE
RESULTS
USB
The program list is displayed.
Pr:01
Copy-Paste
Pr:02
Pr:03
Pr:04
Pr:05
Pr:06
Pr:07
SELECTING A PROGRAM NUMBER
2. Select the program to configure and press .
A list of the available measurement types is displayed:
— DIRECT FLOW type
— INDIRECT type
— OPERATOR type
— QUICK TEST type.
DIRECT FLOW
INDIRECT
OPERATOR
QUICK TEST