7. Turn the main switch into the on position. The gas flows into the burner where it is ignited.
8. Close the boiler front door.
Warning: ATTACK P boiler is a version of non-electrical installation.
STOP  PUTTING THE BOILER OUT OF OPERATION
For a short-time inactivity:
y switch the main switch off. The valve closes because of losing the voltage and the gas supply is
interrupted
y the flame of ignition burner still burns, the boiler is in a stand-by mode (EKO, PLQ, P)
y in the case of need, put the boiler into operation by switching the main switch on
y ensure the heating system against frost damage
For a long-time inactivity:
y remove the boiler door
y turn the main switch off - the gas supply to the burners gets closed
y turn the control button of the valve in the direction of arrow and release, thus close the gas supply
to the ignition burner and other burners (EKO, PLQ, P)
y unplug the supply cable from electricity mains
y close the manual gas valve on the supply pipe next to the boiler
y close the boiler door
y ensure the heating system against frost damage
Warning: The ATTACK P boiler is without electrical installation.
OPERATION CONTROL
The boiler is secured against dangerous operation states while working. However, it is not pos-
sible to prevent from the failures the cause of which is not included in the boiler mechanism. There-
fore it is necessary test the boiler once in three days after being started and to check the following:
y whether the system is filled with water and there is no leakage
y whether there is free approach of the outside air
y whether the flue gas or gas cannot be smelled
y whether there is no extra noise when burning the gas and no imperfect burning indicated by the
change of flame's blue color
The breakdowns detected must be reported to the service worker who put the boiler to
operation. If there is a gas leakage, the gas supply must be closed. The breakdowns found
must be removed immediately.