Chapter 4: Preinstallation checklist
Before you install the
Avaya Virtual Services Platform 8000 Series, make sure that you complete the
tasks in the preinstallation checklist.
No. Task Description
1. Review the technical specification for
the switch. Make sure that the area
where you install the switch and where
it will operate meet the requirements.
For the physical, electrical, and environmental
specifications, see Technical specifications on
page 32.
2. Verify the power supply unit (PSU)
specifications. Optionally order a
redundant PSU to provide redundancy
and load sharing.
See AC power supply specifications on
page 73 or DC power supply
specifications on page 78.
3. Make sure that you have the following
tools and cables:
Phillips #2 screwdriver
RJ-45 console port cable
ESD cable
See Cable requirements for the VSP 8000
Series on page 69.
4. Unpack the equipment. Observe ESD precautions when you unpack
the equipment. See Electrostatic discharge. on
page 30
5. Verify the contents of the shipped
package.
See Package contents on page 34 for a
description of the components that are
provided with the switch. If any components
are missing, contact Avaya support at http://
support.avaya.com/.
6. Make sure that the power cord has the
correct country-specific termination.
7. Prepare the rack. Ensure that there is enough rack space to
accommodate a 2RU switch (8.8 cm).
Ensure that the rack is bolted to the floor and
braced if necessary.
Ensure that the rack is grounded to the same
grounding electrode used by the power service
in the area. The ground path must be
Table continues…
November 2016 Installing the Avaya VSP 8000 Series 18
Comments on this document? infodev@avaya.com