Chapter 3: Preparing for installation
In this chapter
• Installation overview on page 25
• Unpacking the 1006r server on page 27
Installation overview
Introduction
This section provides an overview of the steps required to install the 1006r server and
peripheral devices.
Installation checklist
The following checklist identifies the tasks that must be performed when installing the Avaya
CallPilot
®
server. For detailed instructions, see Installing the server on page 29 When you
are finished with the installation, continue with the Installation and Configuration Task List
(NN44200-306).
Note:
If you are installing a High Availability system, follow this checklist for each server, with the
exceptions listed on Installing a High Availability system on page 30
Step Description Check
1 Review the "Installing the Avaya CallPilot server" section in the
Installation and Configuration Task List (NN44200-306), and
completed stage 1 of the "Installation checklist."
Avaya CallPilot® 1006r Server Hardware Installation December 2010 25