EasyManua.ls Logo

Avon Prindle 15 - Mast and Rigging; Masthead

Default Icon
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Lock line
in
jam cleat at
end
of tiller
by
pulling line
up.
To lower rudder, release uphaulline from jam cleat
and pull ball at
end
of downhaul line until lock bolt
engages spring loaded pin
in
rudder casting.
In
operation
if
the
rudder
is
pulled up too far, the
head
of
the
rudder
blade
will
hit
the
washers at the top
of
the
casting. This could chip your
rudder
blade. To
prevent this, tie a knot
in
pull down line
about
3"
from
ball. Adjust position of knot
so
that
the
raised
rudder
stops just short of hitting the washers.
MAST
AND
RIGGING
Masthead
15 & 18: Masthead
is
assembled before shipping.
16:
To
assemble your masthead, take
the
main
halyard wire
and
thread eye
end
through aft side of
masthead casting (side with curf). Align sheaves with
holes
in
masthead
casting and insert clevis pins
(1
")
through. Insert cotter ring through pin.
Attach main halyard line tail to eye of main halyard
wire with bowline. Tie off main halyard line
and
wire to
the base of
the
mast.
-10
-

Related product manuals