EasyManua.ls Logo

Azbil ALTJ 9000 Series - Disassembly and Assembly; X84; Disassembling the Probe

Azbil ALTJ 9000 Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9-2
Chapter 9 Maintenance and Inspection
9-2 Disassembly and Assembly
The following gives the procedure if each part must be disassembled or assembled to check the seal, replace parts, or
clean the device.
Disassembling the Probe
Do not disassemble the probe if possible, in order to maintain airtightness. Before disas-
sembling the probe, be sure to turn off the power. Additionally, before disassembling a
probe that is pulled out of the water, be sure to wipe off all moisture.
Fig. 9-1. Structure of the probe
Hollow cable
Gland
Shell
Cover (upper portion)
Connector
Housing
Printed circuit board
Seal cap (balloon)
Meterbody
Cover (lower portion)

Table of Contents

Related product manuals