EasyManua.ls Logo

Azbil ALTJ 9000 Series - Replacement Parts

Azbil ALTJ 9000 Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9-17
Chapter 9 Maintenance and Inspection
9-4 Replacement Parts
To use the product in good condition, the following parts used for the probe need to be replaced periodically. Note
that the replacement cycle may vary depending on the temperature and fluid measured.
Part name Replacement cycle
Seal cap 2 years
O-ring (Probe) 2 years or
Replace the O-ring whenever the probe is
disassembled.
Rubber diaphragm (for sludge/seawater, optional
specifications P-)
2 years or
Replace the diaphragm in less than 2 years if it is
removed.

Table of Contents

Related product manuals