Recommended maintenance and
monitoring programme
Baltimore Aircoil Company equipment needs to be properly installed, operated and maintained. Documentation of
the equipment used, including a drawing, technical data sheet and this manual should be kept on record. To
achieve long, trouble-free and safe operation, it is necessary to establish an operating plan including a programme
of regular inspection, monitoring and maintenance. All inspections, maintenance and monitoring actions should be
recorded in a cooling system logbook. The operating and maintenance instructions published here can be used as
a guide to achieve these goals.
In addition to establishing the operating plan and the cooling system logbook it is recommended to conduct a
cooling system risk analysis, preferably by an independent third party.
For more specific recommendations on keeping your cooling system efficient and safe, contact your local BAC
Balticare service provider or representative. Name, e-mail and phone number can be found on the website
www.BACService.eu.
Checks and adjustments Start-Up Every
month
Every 3
months
Every 6
months
Every start of adiabatic
season, Spring
Adiabatic pre-cooler water flow X X X
Level switches (optional) X X
Tighten electrical connections X X X
Rotation of fan(s) X
Motor voltage and current X X X
Unusual noise and/or vibration X X X
Inspections and monitoring Start-up Every
month
Every 3
months
Every 6
months
Every start of adiabatic
season, Spring
General condition of the equipment X X X
Adiabatic pre-cooling pads X X X
Heat transfer coil X X
Water distribution pipe X X X
Float switch (ball can move freely) X X X
Cleaning procedures Start-up Every
month
Every 3
months
Every 6
months
Every start of adiabatic
season, Spring
Adiabatic pre-cooling media X X X
Adiabatic gutter system X X
Sump X X
Coil (remove dust) X
Auxiliary equipment integrated in the cooling system may require additions to the table above. Contact
suppliers for recommended actions and their required frequency.
W W W . B A L T I M O R E A I R C O I L . E U
2

Other manuals for BAC Trillium Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BAC Trillium Series and is the answer not in the manual?

BAC Trillium Series Specifications

General IconGeneral
BrandBAC
ModelTrillium Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals