EasyManuals Logo

BAC Trillium Series Operating And Maintenance Instructions

BAC Trillium Series
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background imageLoading...
Page #4 background image
W W W . B A L T I M O R E A I R C O I L . E U
CONSTRUCTION DETAILS
Details
1. Heat exchanger
2. Coil headers
3. Casing
4. Fans
5. Pre-cooler media
6. Pre-cooler drain valve
7. Pre-cooler drain
8. Pre-cooler flow valve/meter
9. Pre-cooler water distribution gutter
10. Pre-cooler water distribution pads
11. Ambient temperature sensor
12. Power panel
13. Control panel
14. Make-up
15. Recirculation pump (optional)
16. Flow switch (optional)
17. Level switch (optional)
18. Make-up flow balancing valve
19. Coil connections
4
TVFC
1
1 Construction details
1 Construction details

Other manuals for BAC Trillium Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BAC Trillium Series and is the answer not in the manual?

BAC Trillium Series Specifications

General IconGeneral
BrandBAC
ModelTrillium Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals