Operation manual for BAUER RAINSTAR Series T32, T42 58
PE - pipe
X 1 X 2
65
T 32 10 mm / 0,39 inch 95 mm / 3,74 inch
75
T 32, T 42 10 mm / 0,39 inch 95 mm / 3,74 inch
85
T 42 10 mm / 0,39 inch 105 mm / 4,13 inch
90
T 42 10 mm / 0,39 inch 110 mm / 4,33 inch
When using a PE-pipe repair coupling you must increase the spacing x 2
symmetrically by 15 – 20 mm / 0,59 – 0,79 inch.
Step 5:
Adjust the right guide bar at x 3 to the edge of the inner reel wall by turning the helically grooved spindle.
(see chart)
PE – Rohr
X 3
65
T 32 0
75
T 32, T 42 0
85
T 42 0
90
T 42 0
WARNING!