4-3
4. Performing High Voltage Test
Switch on PGK and perform high voltage test, Continued
0
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
100mA
10mA
1mA100µA
10µA
1µA
F1
F2
PGK
T / min
U
DC
U
max
B
0
20
4
0
6
0
8
0
1
0
0
U [kV]
I
0
0
0
PGK control panel
Setting current measuring
range and timer
Step Additional adjustments
Set current measuring range switch to required
measuring range.
As requested:
Set timer to required shut-down time of high voltage
(0-30 minutes).
Prior to high voltage
clearance
H.V. control panel
11
12
11 12
15
15
13
14
In case of emergency, cut off Testing Set with the
EMERGENCY STOP push-button switch .
☞
15
0
2
0
4
0
6
0
8
0
1
0
0
U [kV]
I
- All persons must leave hazard zone!
- Secure hazard zone according to local safety rules and
regulations!
Perform high-voltage test
Press ready for switching on H.V. push-button switch
. Testing Set is READY FOR SWITCHING ON H.V.
Green pilot lamp extinguishes, red pilot lamp is
illuminated.
Press H.V. clearing switch .
Testing Set is ACTIVATED; pilot lamp of switch and
red pilot lamp is illuminated.
Read test values for voltage and current on the