Autostacker™ Parking Lift 12 P/N 5900002 — Rev. D — August 2019
Installation Checklist
Following are the steps needed to install an Autostacker; perform them in this order.
☐ 1. Review the installation Safety Rules.
☐ 2. Make sure you have the necessary Tools.
☐ 3. Plan for Electrical Work.
☐ 4. Select the installation site.
☐ 4. Check Clearances around the Lift.
☐ 5. Create a floor plan.
☐ 6. Position the Leg Assemblies and other components.
☐ 7. Attach the Bottom and Top Connector Tubes.
☐ 8. Anchor the Bases to the ground.
☐ 9. Set up the Console and attach the Power Unit.
☐ 10. Connect the Hydraulic Hoses.
☐ 11. Connect the Return Lines.
☐ 12. Connect the Power Unit.
☐ 12. Attach the Conduit Tube.
☐ 12. Install the Control Stands.
☐ 13. Wiring a Power Disconnect Switch.
☐ 14. Install a Thermal Disconnect Switch.
☐ 15. Test the Autostacker.
☐ 16. Add the Tire Trough and Tire Stops.
☐ 17. Add the Platform sections and Drive-Up Ramp.
☐ 18. Lubricate the Autostacker.
☐ 19. Review the Final Checklist.
Procedures modified and/or specific to a
Multi-Lift
configuration only. See Multi-Autostacker for
more information.