EasyManua.ls Logo

BendPak LR-10000 - Page 13

Default Icon
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LR-10000 Low-Rise Scissor Lift 13 P/N 5900075Rev. B August 2021
Select the Power Unit Stand Location
The Power Unit Stand can go on either side of the Lift, up to 55 in. / 1,397 mm away using the
provided Hydraulic Hoses.
Operators must have a full, unobstructed view of the Lift and
easy access to the Lift Controls at all times
.
Depending on the location you choose, you may need to make adjustments to the Hydraulic
connections and Safety Release Handle.
Important: The Safety Release Handle
must
be on the same side of the Lift as the Long Hydraulic
Hose and Power Unit Stand.
Note: For the remainder of the installation process, we will illustrate the Power Unit Stand positioned
on the Left side of the Lift. For Power Unit Stands on the Right side of the Lift, make the
necessary changes listed below.
The following drawing shows the Power Unit Stand on the Left side of the Lift (
leave pre-installed
Hydraulic connections as is
).
The following drawing shows the Power Unit Stand on the Right side of the Lift (
adjustments to
hydraulic connections required
).

Other manuals for BendPak LR-10000

Related product manuals