Completing NGC Fraction Collector Installation
After plumbing the NGC Fraction Collector, complete the
installation and adjustments.
1
Place the plastic drip tray on the FC with the notched corner
facing the left rear of the FC platform.
2
Place the metal rack tray into position, ensuring it is aligned
correctly on the locating pins.
3
Turn on the fraction collector using the power button on
the front.
4
The gantry and dispense head will move to the home
position when the NGC is powered up and the fraction
collector is detected by the system.
Note: The gantry will move quickly from the home position
to the first collection tube at the start of a run. Ensure there
are no objects in the way before starting collection.
5
Place the racks on the FC, ensuring they are correctly
aligned on the raised locating pins. Identifier labels on the
racks should face right.
6
Before using the fraction collector, adjust the z-height of the
dispense head to sit within 10 mm of the collection vessels.