2-1 SETUP INSTRUCTIONS
Assembly Procedure
(See Figures 2-1 and 2-2.)
Tools Required:
Knife
Wire cutter
Phillips screwdriver
Medium straight screwdriver
Small straight screwdriver
1/32" Allen key (included)
Adjustable wrench
1. Remove the uptake stand from its shipping box and place in an area suitable for assembly and setup.
2. Determine how the unit will be positioned in the department where it is to be used. The computer,
keyboard, CPU and monitor will need to be installed correspondingly, facing to either the left or
right of the large shelf push bar on the stand. The normal configuration is the keyboard to the left of
the push bar.
3. If you desire to change the orientation, use a Phillips screwdriver to remove the six screws that hold
the CPU bracket to the top of the large shelf. Remove the bracket and place it aside, retaining the
screws.
4. With a Phillips screwdriver, remove the four screws that hold the large shelf cable cover to the side
of the large shelf. Remove the cable cover and place it aside, retaining the screws.
NOTE: The cables may be already installed into the stand.
5. With a Phillips screwdriver, remove the three screws that hold the vertical cable cover to the vertical
column. Remove the vertical cable cover and place it aside, retaining the screws.
6. If you will be using the optional well counter with your system, ensure that the well support shelf is
on the appropriate side of the stand. It should be positioned on the same side that the keyboard will
be positioned. To move the well counter shelf to the opposite side, use a medium slotted screwdriver
to remove the four screws that hold the well support shelf in place, remove the shelf and replace the
screws. Now remove the four screws on the other side of the vertical column and use these to secure
the well.
7. The large shelf side cable hole cover should be positioned on the same side as the keyboard. If it is
not, use a Phillips screwdriver to remove the screw that holds the cover to the large shelf. Remove
the plastic gasket from the opposite side cable hole and position it on the hole from which the cover
was just removed. Now take the large shelf side cable hole cover and install it on the opposite side
(the side from which the plastic gasket was just removed).
8. Using a small slotted screwdriver, remove the two screws that hold either of the well support
brackets to the well support shelf. Remove this bracket, then loosen the screws on the remaining
bracket so that the bracket has a small degree of play.
9. Remove the well counter and two cables (located in the base) from their shipping carton. Slide the
well counter onto the well shelf so that the cable connectors are facing in the same direction as the
large shelf push bar. Ensure that the well support bracket which is still attached to the well support
shelf is positioned over the edge of the well counter base. With a straight screwdriver, tighten the
two screws to secure the well support bracket over the well counter base.
10. Using a small straight screwdriver, replace the well support bracket removed in step #8. Ensure that
the bracket is positioned over the edge of the well counter base before tightening the two screws that
hold it in position. Ensure that both well support brackets are firmly in place.
2. SETUP INSTRUCTIONS