EasyManua.ls Logo

Biodom 33 - Boiler Commissioning

Biodom 33
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Biodom 33
Biodom 33Biodom 33
Biodom 33
|
| |
| instructions for use, maintenance and installation | version 1.0 July 2017
14
Figure 8
White – Boiler supply (220 V)
Black – Pump
If the power supply cable is damaged, it must be replaced. It can only be replaced by an authorized
person.
Electrical connection must be easily accessible even after the pellet boiler is installed.
ATTENTION
When the boiler installation is finished, it is mandatory to perform measurements of smoke
gases discharge.
4. BOILER COMMISSIONING
Boiler commissioning can be performed only by a manufacturer authorized technician, otherwise
the warranty is void.
INSTRUCTIONS FOR SAFETY OF PERSONS, ANIMALS AND PERSONAL PROPERTY
We wish to inform the installer on some general guidelines, which must be complied with for correct
installation of pellet boiler. These are required standards, but are not sufficient; for further and more
detailed information it is necessary to read the rest of the Instructions for use, maintenance and
installation.
Connect the pellet boiler to electrical network;

Related product manuals