4.5 CHIMNEY SUPPORT INSTALLATION
UNIVERSAL ROOF SUPPORT
This support has three possible uses:
1. For Secure Temp
S2100+
/ Nova Temp
HT6000+
/ Secure Temp
GX
, it must be used on a
roof to support the chimney.
2. It may be used on a floor, ceiling or roof above an offset to support the chimney
above the offset.
3. It may be used on a floor, ceiling or roof as a supplementary support when the
chimney height exceeds 15 ft. (4.6 m.).
Table 6 gives maximum height of supported chimney.
NOTE: For the ACBI chimney, a support section (ACBI7SL) must be used every 30 ft.
(9m) or an universal support every 20 ft. (6m) instead of the universal roof support
(ST).
For roof support installation, refer to the instructions provided with the support.
UNIVERSAL OFFSET SUPPORT
This support is used to support the chimney above an offset. When the chimney offset
is used to traverse a wall this support may be used on the wall to support the chimney.
The maximum heights are given in Table 6. For offset support installation, refer to the
instructions provided with the support.
Secure Temp
S2100+
Nova Temp
HT6000+
Secure Temp
GX
Table 6