EasyManua.ls Logo

Blue Bird Vision 2021 - Charging and Battery Management

Blue Bird Vision 2021
210 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-16
DRIVERS HANDBOOK
- OR -
Optional Front Location:
Behind Front Door curb side
Charging
Before charging make sure the bus is in Park Mode (park brake ON and ignition switch OFF).
To charge the High Voltage Battery Packs, your bus is equipped with a dual charging system. This
allows the bus to use AC or DC charging stations. The charge port on the Blue Bird EV is a CCS
which is a "combo" port that will accept either the SAE J1772 or a CCS1 DC charger paddle. The
AC charging system uses the J1772 paddle which fits in the top portion of the port. If using DC
fast charge, the CCS1 paddle will use the entire port.
CCS "Combo" Charge Port
(shown with dust covers removed)
CCS1 DC Fast
Charge paddle
AC Charging
• Uses the J1772 paddle
Typically requires 8 hours to
fully recharge batteries
DC Fast Charging
• Uses the CCS1 paddle
• Can fully recharge bat-
teries in 3 hours
J1772 AC paddle
Standard Location:
Behind Rear Axle curb side
Charge Port Location
Charging Paddles

Table of Contents

Related product manuals