EasyManua.ls Logo

BMW C evolution - Page 170

BMW C evolution
170 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Important data for the quick vehicle check:
Charging time
Charging time of the high-voltage battery unit with stand-
ard charging cable
without Long Range
OE
approx. 2.7 h, 80 % charge at charge current: 10 A
with Long Range
OE
approx. 4.2 h, 80 % charge at charge current: 10 A
Charging time for the high-voltage battery using a stand-
ard charging cable or Mode3 charging cable
without Long Range
OE
approx. 2.2 h, 80 % charge at charge current: 15...16 A
with Long Range
OE
approx. 3.5 h, 80 % charge at charge current: 15...16 A
Tyre pressure
Tyre pressure, front 2.5 bar, Tyre cold
Tyre pressure, rear 2.5 bar, One-up, tyre cold
2.9 bar, two-up and/or with luggage, tyre cold
For further information on all aspects of your motorcycle, visit
bmwmotorrad.com
Order No.: 01 40 8 388 301
08.2016, 4th edition, 01
*01408388301*
*01408388301*
*01408388301*

Table of Contents

Related product manuals