CAUTION!
It must be ensured that the hydraulic shutoff valve shuts off the winch in the lowest position of
the crane fork. Otherwise, damage is caused to the wire cable and the hydraulic winch.
After the work with this unit has been completed, or if the work with the material and installation
lift LHX is stopped for a longer period of time, the unit must be switched off using the circuit
breaker, in order to avoid unnecessary warming up of the hydraulic oil and unnecessary wear
and tear.
After the work is completed and the unit is left, it must be secured against unintended use (lock
on circuit breaker)!
WARNING!
The load must be secured on the crane fork with appropriate load securing
equipment (e.g. lashing straps) when moving up and down! The load must be placed
centrally in accordance with the crane fork diagram.
WARNING!
Prior to commencing work with the installation lift, the operator must be familiarised
with the unit and accurately instructed (Section 43 VBG 14 UVV).
Read, understand and follow the safety regulations and instructions by the
manufacturer as well as the operating manual.
Also read, understand and follow the safety regulations of the employer and the
workplace regulations.