Operation
BOMAG
22
BPR 35/40 D BPR 35/60 D
4.1 General
If you are not yet acquainted with the controls
and indicating elements on this machine you
should thoroughly read chapter 3 “Indicators
and control elements” before starting work.
All indicators and control elements are de-
scribed in detail in this chapter.
4.2 Before starting work
Please observe strictly the safety regulations
in chapter 2 of these operating and mainte-
nance instructions.
Refer also to the detailed description in the
chapter “Maintenance”.
Top up missing lubricants according to the mainte-
nance instructions.
l Park the machine on ground as level as possi-
ble.
l Check fuel tank and fuel lines for leaks.
l Check the engine oil level, if necessary fill up
to the top mark.
l Check the fuel level, fill up if necessary.
l Check the dry air filter service indicator.
l Check the condition of the complete machine
and all screw joints for tight fit.
!
Danger
Loss of hearing!
Wear your personal noise protection means
(ear defenders) before starting operation.
Go to Discount-Equipment.com to order your parts