EasyManua.ls Logo

BONAIRE 5000D - Page 12

BONAIRE 5000D
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION INSTRUCTIONS
12
Unit Installation
3.3.2 Installation of the bleed off hose is required to prevent mineral deposits in the
system. Adjust the bleed restrictor bracket to allow control of the bleed rate to suit
local supply water conditions. Adjust the bleed off to approximately 2 ½ gallons /
hour and adjust as necessary.
Ensure the cooler is level.
Adjust the mounting legs if necessary.
Turn the water on to the unit and allow the unit to fill.
Check water fittings do not leak.
Ensure float valve operates.
Fit the grill panels and check for even wetting of the filter pads.
Check bleed off rate.
Slide hose this way
to reduce flow
Slide hose this way
to increase flow
Mounting legs

Related product manuals