Check List
Use this list to check the installation.
Unit
□All equipment ordered by the customer is installed.
□The unit is level and secure.
□The water supply line has been flushed to clear swarf and debris and is free of leaks.
□The tank is free of foreign matter and debris. The water isolating tap is turned ON.
□Water drainpipe work is completed and sealed.
□The fan assembly is correctly located and the fan blade spins freely in the venturi.
□The mains and control wiring are complete and the circuit breaker is turned ON.
□The water basin fills with water and the float valve closes correctly when the water level
is below the overflow level.
□The water pump operates correctly when turned ON at the controller.
□ Bleed rate is set to suit local water conditions.
□The fan operates through the entire speed range.
□Water distribution is even with the filter pads fitted and the air conditioner operating
pump and fan.
□All Controller functions for the appliance operate
Ductwork and general
□All roof penetrations are fully sealed and watertight.
□All ductwork is completed to plan, correctly supported and airtight, with no bend tighter
than 1.5 x the ductwork diameter.
□Air distribution checked, dampers are adjusted and all outlets correctly adjusted and
wiped clean.
□Man hole cover replaced.