EasyManua.ls Logo

Bosch BOVB 18 Series - Page 12

Bosch BOVB 18 Series
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
|
Bosch IDS BOVB 18 Installation Instructions
10.2020 | Bosch Thermotechnology Corp.Data subject to change
2. Remove the pressure tap cap from both service valves.
Figure 15
3. Purge the refrigerant lines and indoor coil with dry nitrogen.
Figure 16
This pipe
must have
a thimble
4. Wrap a wet rag around the valve body to avoid heat damage and continue the
dry nitrogen purge (Fig. 17).
Braze the refrigerant lines to the service valves.
Braze the lter drier to the Liquid Line.
NOTICE:
All units come standard with a bi-flow filter drier. Braze the
filter drier to the liquid line, using caution not to push the
refrigerant line too hard past the stop within the lter drier
(this could damage the drier).
Continue the dry nitrogen purge. Do not remove the wet rag until all brazing
is completed.
Remove the wet rag before stopping the dry nitrogen purge.
Figure 17
Shipped in package
field installed
3-4" from valve
5. Replace the pressure tap caps after the service valves have cooled.
Figure 18

Table of Contents

Related product manuals