Appendix
41
Systemlösung – 6 720 885 509 (2018/03)
4.2 Further technical documents
Observe the following “Technical Information”:
• TI024: Requirements of the boiler installation room –
Information for the installation of boilers and boiler
house components
• TI041: Requirements to the waste heat generating
power unit in conjunction with a downstream waste
heat steam generator for waste heat utilisation
• TI074: Information on installation of CHP system with
external waste heat utilisation
2.5 Ventilation
2.5.10 Supply air duct x
2.5.20 Multi-leaf damper x (opt.)
2.5.30 Weather grille x (opt.)
2.5.40 Extract air fan x (opt.)
2.5.50 Exhaust air duct x
2.5.60 Multi-leaf damper x
2.5.70 Weather grille x
3 Electrical installation (KG 440)
3.1 Electrical installation
cable between boiler and CHP control cabinet and electrical
3.1.10 Components x
3.1.20 Cable route x
3.1.30 NS/MS infeed x
4 MSR (KG 480)
4.1 control cabinet
4.1.10 Control cabinet for all components x
4.1.20 Higher level control MEC Control x
4.1.30 Bosch CHP control x
4.1.40 Bosch steam boiler control x
4.1.50 Superordinate sequential control (further CHP or steam boilers) x x
4.1.60 Superordinate emergency stop chain x
5 Other
5.1 Extra works x
5.1.10 Commissioning x x
5.1.20 Initial filling, equipment x
5.1.30 Maintenance/service x x
Supplier
Bosch
Item Description CHP Boiler External
Table 17 List of components