INSTALLATION
- 5 -
2 - ELECTRICAL CONNECTIONS - THRI/THI/THISION BOILERS
- Remove the shunt (4) from the connector (2),
- Connect the QAA 73 sensor (1) to the
connector (2) and place it on the X10-01
terminal of the LMU while making sure the
terminals connections are correct.
For a single circuit:
- Remove the shunt and its connector (3) from
t
he X10-02 terminal.
For a double circuit:
- The shunt and its connector (3) remain in
pl
ace.
- In cases where a room thermostat is instal-
led, it will be connected to the X10-02 termi-
nal after removing the shunt from the
co
nnector (3).
X10-01 X10-02
2
1
3
4
1122
LMU
6 720 812 406_02.1GX
2.1 - Using and setting the QAA 73 for the boilers of type 0.9-9/2-13/2-17/5-25/10-35/
10-50
2.1.1 - Using the QAA 73
For the QAA 73 using, refer to the "instructions"
leaflet supplied with the QAA 73 sensor
2.1.2 - Setting the QAA 73
For the QAA 73 setting, refer to the technical
instructions of the boiler.
2.2 - Using and setting the QAA 73 for the boilers of type 10-100
For the setting and using of the QAA 73, refer to
the technical instructions of the boiler.
After using the QAA 73 to modify
or read the setting of each LMU ma-
nagement unit:
- disconnect the QAA 73 from
co
nnector (2),
- reposition the shunt (4) on the
con
nector (2) then connect it to
the X10-01 terminal,
- reposition the connector (3) on
the X10-02 termi
nal.