4/128
Bosch Rexroth AG, CytroBox, RE 51057-B/11.19
7.4 Water supply connection 64
7.5 Electrical interface assignment 65
7.5.1 Voltage supply feed-in assignment 65
7.5.2 Interface 20X1 assignment: Digital input and output signals 66
7.5.3 Interface 21X1 assignment: Safe Torque OFF (STO) 67
7.5.4 Interfaces 22X1 and 22X2: Multi-Ethernet
control communication as well as 30X1: CytroConnect 68
7.5.5 Interface 23X2 assignment: Connection of
cooling unit and 23X3: Watervalve connection(optional) 69
7.5.6 Interface X26 assignment 69
7.6 Electrical interface connection 70
8 Commissioning 71
8.1 First commissioning 71
8.1.1 Before commissioning 71
8.1.2 Filling of the hydraulic power unit 71
8.1.3 Switching on the power supply 73
8.1.4 Bleeding the entire hydraulic system of the machine 73
8.1.5 Commissioning of the "hydraulics" 73
8.1.6 Flushing the hydraulic system 75
8.1.7 Common errors during commissioning 76
8.1.8 Commissioning of the "electronics" 77
8.2 Re-commissioning after longer standstill 96
9 Operation 97
10 Maintenance and repair 98
10.1 Cleaning and care 98
10.2 Inspection 99
10.3 Warning devices 99
10.4 Maintenance schedule 100
10.5 Maintenance 100
10.5.1 Checking the electric components/installation 100
10.5.2 Filling level monitoring 101
10.5.3 Monitoring the oil temperature 101
10.5.4 Monitoring the filter element contamination (pressure filter) 102
10.5.5 Visual inspection of the air filter 103
10.5.6 Checking the pressure values 103
10.5.7 Hydraulic fluid care 103
10.5.8 Visual inspection for leakage, cracking, force effects and corrosion 104
10.6 Spare and wear parts 105
11 Decommissioning 108
11.1 Preparing for decommissioning 108
11.2 Decommissioning process 108
12 Disassembly and replacement 109
12.1 Preparing disassembly 109
12.2 Disassembly process 109
13 Disposal 110
13.1 Environmental protection 110
14 Extension and modification 111