EasyManua.ls Logo

Bosch Worcester Greenstar CDi Classic System ErP Series - Gas Valve, Siphon, PCB;Fuse Procedures

Bosch Worcester Greenstar CDi Classic System ErP Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SERVICING AND SPARES
6 720 815 724 (2015/11)44
7. Gas valve
Isolate gas supply at boiler gas cock.
Pull out air inlet tube (A).
Undo top gas connection (B) to gas valve.
Undo bottom gas connection (C) to gas valve.
Undo two securing screws (D)on the underside of casing.
Pull valve up and forward out of boiler.
Disconnect electrical connections.
Replace valve with new seals and check for gas soundness.
Fig. 75 Gas valve removal
8. Siphon/condensation trap
1. Pull condensate hose out of the trap.
2. Remove trap from boiler.
Clean trap and check that the connection to the heat exchanger is
clear.
Fill the condensate trap with approximately 1/4 litre of water and
refit in reverse order.
Fig. 76 Siphon removal
9. Access to boiler control components
Remove 3 screws (A) and remove cover from control.
10. PCB fuse
Remove fuse (B) from the PCB and replace.
There is a spare fuse clipped into the cover.
Fig. 77 Component and fuse access
11. PCB removal
To gain access to the PCB:
Remove the five screws shown in the diagram below and remove the
PCB cover.
Fig. 78 PCB access
The valve will require setting, follow procedure “Setting
the gas/air ratio” in the gas conversion section.
7.
A
B
D
C
6720647361-34.1Wo
6 720 815 724-13.1O
2.
1.
6720647361-35.2Wo
A
B
9.
10.
6720647361-36.2Wo

Table of Contents

Related product manuals