EasyManua.ls Logo

BÖWE P15 - Automatic Operation Guide

Default Icon
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
P12-P15-P18
6 Fixing the Machine in Place 6
Anchoring:
Cementing in stone bolts:
Steps:
Insert stone bolts in the holes of the angle bracket with spring washers and nuts.
Level the machine. If the floor is uneven, level the machine with wedges and even out the surface with
filler (epoxy resins).
Fill anchoring holes with fast-drying cement.
After it sets, tighten the nuts evenly.
Safety expansion anchor:
Steps:
Position the machine in its intended position.
Use the holes of the angle bracket as a drilling template.
Pre-drill with a 14 mm (.5 in) stone drill. Minimum drilling depth 100 mm (3.9 in). Drill in vertically!
Drill the holes 140 mm (5.5 in) deep with the 18 m (0.7 in) stone drill.
Remove the nuts and washers of the expansion anchor. Shorten the upper plug brush.
Insert the anchor in the bore hole.
Level the machine.
If the floor is uneven, level the machine with wedges and even out the surface with filler (epoxy resins).
Tighten the nuts on the anchors evenly.
Threaded rod (bored through ceiling)
Steps:
Position the machine in its intended position.
Use the holes of the angle bracket as a drilling template.
Pre-drill with 14 mm (.5 in) stone drill. Drill in vertically!
Use a 20 mm (.8 in) stone drill to drill the holes for normal ceiling installation
(See foundation schematic, Point 5.4)
Position the machine or attach the angle bracket and level.
The angle bracket must lie flat against the ceiling.
If the floor is uneven, level the machine with wedges and even out the surface with filler (epoxy resins).

Other manuals for BÖWE P15

Related product manuals