EasyManuals Logo

BrainBee OPA-100 User Manual

BrainBee OPA-100
22 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #12 background imageLoading...
Page #12 background image
OPA-100 INSTALLATION AND SERVICE OPERATIONS
MS0100-06-0_service_manual.doc 12/22 INSTALLATION AND SERVICE OPERATIONS
3.4 SUBSEQUENT VERIFICATION
Subsequent verification of an instrument at the same location may include the following tests.
For any subsequent verification clean up the glasses and probe.
For short-term subsequent verification, perform all tests included in the initial verification
except for the power check and the warm-up check.
For short-term subsequent verification, perform a filter calibration using the filter provided with
OPA-100.
For long-term subsequent verification, perform all tests included in the initial verification.
When the instruments have been moved to a new location (e.g. change in business address
as defined by the responsible legal authority), or have undergone repairs other than the
replacement of probe, perform all tests included in the initial verification.
3.5 ROUTINE TESTING
A routine test of the instruments should consist of at least the following.
Perform an external visual control.
Clean the glass lenses and the sample probe.
Pay attention to every screen message.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BrainBee OPA-100 and is the answer not in the manual?

BrainBee OPA-100 Specifications

General IconGeneral
BrandBrainBee
ModelOPA-100
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals