Do you have a question about the Broderson IC-80-1L and is the answer not in the manual?
Detailed dimensions for IC-80-1L, IC-80-2L, and IC-80-3L models.
Information on turning radii and aisle width for the IC-80-L model.
Essential safety guidelines for operating the crane, covering operator qualification.
Daily checks for crane condition and rope inspection recommendations.
Description of the IC-80 instrument panel, including gauges and warning lights.
Explanation of ignition switch, lighting package, and turn signal controls.
Details on how control levers operate outriggers, boom, swing, and hoist.
Explanation of the three steering modes: four-wheel, rear-wheel, and crab steer.
Recommended steps for safely driving the IC-80 vehicle.
Procedure for placing the crane in operation, including warm-up and outrigger setup.
Information on normal gauge readings and important fuel tank warnings.
Tips on RCL operation, handling overloads, and using the emergency override.
Checking the outrigger warning light for proper function with RCL setup.
Definitions and rules for interpreting crane capacity charts and load limits.
Instructions for correct installation of wire rope on sheave blocks.
Guidance on reeving for two-part lines and using the wedge socket.
Function and maintenance of the outrigger cylinder check valve.
Explanation of boom elevation and telescope cylinder holding valves.
How the anti-two-block system prevents damage and its override function.
Step-by-step guide for installing the boom extension onto the boom tip.
Procedure for properly storing the boom extension.
Examples demonstrating how to interpret capacity charts with boom extensions.
Safety guidelines for operating the front auxiliary winch.
Instructions for towing other vehicles and being towed with pintle hooks.
List of standard symbols used for switches and indicators on BMC cranes.
Key safety rules for personnel performing maintenance on the crane.
Safety measures to avoid pinch points and prevent falls during maintenance.
Comprehensive checklist for inspecting and testing a new unit before job placement.
Daily and weekly inspection procedures for the crane operator.
Maintenance tasks required at 50-hour and 250-hour intervals.
Lubrication details for swing bearing, transmission, and drive axles.
Chart detailing fluid capacities for various systems of the IC-80.
Schedule detailing lubrication points, types, and intervals for the IC-80.
Recommended procedure for cleaning and lubricating wire rope.
Steps for installing and inspecting the hoist cable for safety and longevity.
Description of the IC-80's hydraulic system, including pump functions.
Details on the IC-80's three-mode steering system and its operation.
Instructions for maintaining hydraulic oil cleanliness, temperature, and level.
Recommended hydraulic oils and compatibility information for the IC-80.
Guidelines for installing hydraulic seals and detecting leaks safely.
Procedure for checking and adjusting winch circuit hydraulic pressure.
Procedure for checking and adjusting boom and outrigger circuit pressures.
Procedure for checking and adjusting the boom lift cylinder holding valve.
Procedure for checking and adjusting the telescope cylinder holding valve.
Steps for cleaning and replacing the air cleaner element and dust cup.
Procedures for checking coolant level, radiator fins, and flushing the system.
Guidance on checking fasteners, swing gearbox, and wheel toe-in.
Steps for testing and adjusting the crane's parking brake.
Table of recommended torque values for various bolt sizes and grades.
Diagram showing electrical connections for battery, starter, engine, and lights.
Diagram showing electrical connections for transmission, steering, and controls.
Diagram illustrating the hydraulic system, including controls and cylinders.
| Brand | Broderson |
|---|---|
| Model | IC-80-1L |
| Category | Construction Equipment |
| Language | English |





Loading...