Do you have a question about the Bryant 925TA and is the answer not in the manual?
Important safety precautions and warnings for furnace installation and operation.
Covers location, air, condensate, piping, electrical, and venting for installation.
Procedures for servicing, maintenance, and parts replacement.
Reference tables for clearances, dimensions, and data.
Key regulatory compliance information for Massachusetts installations.
Covers fire, explosion, electrical shock, CO poisoning, and cut hazards.
General safety guidelines for installation and servicing personnel.
Details on direct vent, non-direct vent, and ventilated combustion air applications.
List of parts supplied with the furnace for installation.
Covers installation hazards and general location requirements.
Warnings about CO poisoning and component damage from contaminated air.
Details on direct, non-direct, and ventilated combustion air methods.
Requirements for adequate combustion air based on space volume.
Detailed explanation of standard, known infiltration, and combination air methods.
Instructions for upflow, downflow, and horizontal condensate trap configurations.
Procedure to relocate the condensate trap for proper drainage.
Detailed steps for downflow condensate trap configuration.
Detailed steps for horizontal right condensate trap configuration.
Detailed steps for horizontal left condensate trap configuration.
Cautions regarding freeze protection and property damage from drain issues.
Instructions for routing condensate drains in upflow, downflow, and horizontal orientations.
Specific installation procedures for upflow and downflow configurations.
Guidelines for connecting supply and return air ducts.
Requirements for furnace support and clearances.
Specific installation procedures for horizontal configurations.
Covers furnace support, hazards, and filter arrangement.
Guidelines for filter arrangement and associated hazards.
General guidelines for designing and sizing duct systems.
Guidelines for sizing return ducts and filters.
Information on acoustical treatment for duct systems.
Critical warnings regarding fire and explosion hazards in gas piping.
Installation requirements and codes for gas piping.
Specific gas piping regulations for Massachusetts.
Warnings regarding electrical and fire hazards related to wiring.
General guidelines for making electrical connections.
Instructions for 115V wiring and compliance with US/Canada codes.
Step-by-step guide for installing the junction box.
Guidelines for wiring accessories like EAC and humidifier.
Considerations for using alternate power supplies with the furnace.
Special venting requirements for installations in Canada.
Approved materials and standards for venting systems.
Warnings about CO poisoning and air supply requirements for venting.
General notes on furnace venting systems and chimney use.
Approved materials for combustion air and vent pipes in the USA and Canada.
Overview of venting systems and associated CO poisoning hazards.
Details on vent termination kits and system types.
Optional configuration for combustion air inlet pipe moisture control.
Guidelines for determining the proper location for vent termination.
Recommendations for supporting vent terminations.
Details on direct, ventilated, and non-direct vent system configurations.
Specific vent termination rules for Alberta and Saskatchewan.
Guidelines for sizing vent and combustion air pipes.
Details on installing an optional moisture trap for combustion air.
Additional information for polypropylene venting systems.
Procedure for calculating Total Equivalent Vent Length (TEVL).
Guidelines for insulating combustion air and vent piping.
Procedure for installing vent and combustion air pipe adapters.
Warning about CO poisoning and using polypropylene venting systems.
Procedure for installing vent terminations.
Requirements for roof vent terminations.
Installation details for concentric vent terminations.
Guidelines for sidewall vent terminations.
Procedure for installing the inducer outlet restrictor.
Procedure for calculating Total Equivalent Vent Length (TEVL).
General procedures for furnace start-up and safety checks.
Procedure for priming the condensate trap with water.
Procedure for purging gas lines and checking for leaks.
Procedures for adjusting furnace settings and associated hazards.
Guidelines for adjusting natural gas manifold pressure.
Procedure to verify natural gas input rate by clocking the meter.
Procedure for measuring and adjusting furnace temperature rise.
Procedures for adjusting blower speed and off-delay settings.
Procedure for adjusting thermostat heat anticipator.
Procedure to test the furnace main limit switch function.
Procedure to test the pressure switch function.
Checklist for verifying proper start-up and installation.
Warnings about performing maintenance and electrical hazards.
Guide for diagnosing and resolving furnace operational problems.
Procedure for retrieving stored fault codes from the control.
Warnings regarding furnace operation, maintenance, and electrical hazards.
Guide for troubleshooting and retrieving stored fault codes.
Warning about electrical shock hazards during self-test.
Checklist for verifying proper component self-test and operation.
Guidelines for routine furnace care and maintenance.
Warnings regarding fire, CO, and poisoning hazards during maintenance.
Procedure for cleaning or replacing the furnace air filter.
Procedure for maintaining the blower motor and wheel.
Procedure for cleaning furnace burners and the flame sensor.
Warnings regarding gas piping and electrical safety during maintenance.
Procedure for checking and servicing the hot surface igniter.
Procedure for flushing the collector box and drainage system.
Procedure for cleaning the condensate drain and trap.
Procedure for checking heat pad operation for freeze protection.
Procedure for cleaning primary heat exchangers.
Info on secondary heat exchangers and furnace winterization.
Caution regarding furnace damage from incorrect antifreeze use.
Notes on furnace control grounding and power interruption effects.
Detailed sequence for furnace operation during heating mode.
Detailed sequence for furnace operation during cooling mode.
Procedure for operating the furnace with continuous blower.
Sequence of operation for heat pump applications.
Steps for initial diagnosis based on LED status and voltage checks.
Procedure to determine and analyze furnace status codes.
Steps to verify thermostat signals and furnace operation.
Troubleshooting steps for specific fault codes and component failures.
Lists of replacement parts categorized by furnace group.
Contact information for obtaining replacement parts.
Explanation of the furnace model nomenclature.