EasyManuals Logo

Buderus Logano G124X II/SP Installation And Maintenance Instructions

Buderus Logano G124X II/SP
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
16
Installation and maintenance instructions Logano G124X II/SP special gas-fired boiler • Issue 04/2005
We reserve the right to make any changes due to technical modifications.
Boiler installation7
7.3 Electrical connection
The electrical connections of the boiler must be
manufactured as specified by the local codes and the
current regulations of the National Electrical Code,
ANSI/NFPA–70.
In Canada the regulations of CSA C 22.1 Canadian
Electrical Code, Part 1, must be observed.
The boiler must be grounded as specified by the
regulations of the relevant local authorities; otherwise
follow the regulations of the National Electrical Code,
ANSI/NFPA–70.
Install an ON/OFF switch near the boiler.
z Check that the heating system functions correctly
after any maintenance work.
USER NOTE
When making the electrical connections
follow the circuit diagrams on
Î page 74
to Î page 78.
WARNING!
RISK TO LIFE
from electric shock.
z When conducting maintenance work
label all cables before disconnecting
them.
z If cables are connected incorrectly the
system may not operate correctly with
possibly dangerous consequences.

Table of Contents

Other manuals for Buderus Logano G124X II/SP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Buderus Logano G124X II/SP and is the answer not in the manual?

Buderus Logano G124X II/SP Specifications

General IconGeneral
ModelLogano G124X II/SP
CategoryBoiler
Fuel TypeGas
Heat Exchanger MaterialCast Iron
Operating Pressure3 bar

Related product manuals