EasyManuals Logo

Buderus Logano G124X II/SP Installation And Maintenance Instructions

Buderus Logano G124X II/SP
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
40
Installation and maintenance instructions Logano G124X II/SP special gas-fired boiler • Issue 04/2005
We reserve the right to make any changes due to technical modifications.
Placing the heating system in operation11
11.5 Shutting off gas supply to boiler
1. Set thermostat to the lowest value.
2. Disconnect heating system from the power supply
before carrying out maintenance work.
3. Remove front panel of boiler.
4. Turn gas valve ON/OFF button clockwise to OFF
position. Do not use force.
5. Replace front panel of boiler.
Fig. 39 Remove front panel of boiler
Fig. 40 Gas valve (G124X II left, G124X SP right)
1 ON/OFF button (at ON position)
1
1

Table of Contents

Other manuals for Buderus Logano G124X II/SP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Buderus Logano G124X II/SP and is the answer not in the manual?

Buderus Logano G124X II/SP Specifications

General IconGeneral
ModelLogano G124X II/SP
CategoryBoiler
Fuel TypeGas
Heat Exchanger MaterialCast Iron
Operating Pressure3 bar

Related product manuals