EasyManuals Logo

Burnham SCG Installation & Service Instructions

Burnham SCG
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #36 background imageLoading...
Page #36 background image
36
Vertical Terminations, (SC_ _VT): Install the vertical termination adapter into the last vent section and secure with the
three (3) self-tapping screws provided. If the exhaust termination needs to be extended, a section of EZ Seal vent can be
connected directly to the vertical termination adapter. Seal weather exposed joints of the outer jacket with foil tape or
an exterior grade silicone sealant. To allow for inspection of the system, do not seal the exhaust termination.

Table of Contents

Other manuals for Burnham SCG

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Burnham SCG and is the answer not in the manual?

Burnham SCG Specifications

General IconGeneral
BrandBurnham
ModelSCG
CategoryBoiler
LanguageEnglish

Related product manuals