10 | Decommissioning
40 | 52 Instruction Manual COBRA NC 2500 B WCV_EN_en
10 Decommissioning
DANGER
Live wires.
Risk of electrical shock.
Electrical installation work must only be executed by qualified personnel.
CAUTION
Hot surface.
Risk of burns!
Prior to any action requiring touching the machine, let the machine cool down first.
Shut down the machine and lock against inadvertent start up.
Disconnect the power supply.
Turn off the water supply.
If the machine is equipped with a barrier gas system:
Close the barrier gas supply.
Vent the connected lines to atmospheric pressure.
Disconnect all connections.
If the machine is going to be stored:
See Storage [11].
10.1 Dismantling and Disposal
Drain and collect the oil.
Make sure that no oil drips onto the floor.
Drain and collect the cooling liquid.
Make sure that no cooling liquid drips onto the floor.
Separate special waste from the machine.
Dispose of special waste in compliance with applicable regulations.
Dispose of the machine as scrap metal.