RTG SERIES TILLER 05/16 Assembly Section 3-11
© Alamo Group.Inc.
ASSEMBLY
ASSEMBLY
Step 10. Place the Shield to the front lip of the Tiller and align the holes with the slotted holes in the mainframe.
Use six 3/8” x 1” Grade 5 Bolts and 3/8” Locknuts to attach the Shield.
Shield
3/8” x 1” Grade 5 Bolts and 3/8” Locknuts (6 each Required)
to attach the Shield
Step 11. Reattach the Gearbox Input Shaft Shield and Driveshaft to the Input Shaft.
NOTE: Before operating make sure all fasteners that have been removed and reinstalled are
tightened.