The deployment boom
3.3 Fitting the line to the level-wind
As supplied from the factory, the line is installed into the level-wind wiper arm between the clevis pin
and the removable drop-nose pin, as shown in the illustration below. Should the line need to be
re-fitted it is a simple matter to remove the drop-nose pin, threading the line between the guides and
refitting the pin. Ensure that the toggle on the end of the drop-nose pin is closed fully.
Fitting the line to the level-wind