EasyManua.ls Logo

CAME BKV15AGE User Manual

CAME BKV15AGE
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Sliding-gate operators
BKV15AGE
BKV15AGS
BKV15ALS
BKV15RGS
BKV20AGE
BKV20AGS
BKV20ALS
BKV25AGE
BKV25AGS
BKV25ALS
BKV20RGS
INSTALLATION MANUAL
FA01443-EN
EN
English
Question and Answer IconNeed help?

Do you have a question about the CAME BKV15AGE and is the answer not in the manual?

CAME BKV15AGE Specifications

General IconGeneral
ModelBKV15AGE
Max Gate Weight1500 kg
Motor Voltage230 V AC
Operating Temperature-20°C to +55°C
TypeGate Opener
Safety FeaturesObstacle detection

Summary

Installation Manual

Sliding-gate Operators

Identifies the product type covered by the manual.

General Precautions for Installers

Important Safety Instructions

Crucial safety guidelines for installers.

Main Points of Danger for People

Highlights potential hazards for users.

Dismantling and Disposal

Guidelines for product end-of-life handling.

Product Data and Information

Key Symbols and Product Descriptions

Explains symbols and lists product specifications.

Description of Parts

Operator Components

Lists and illustrates the components of the operator unit.

Control Board

Control Board Layout and Connections

Details the connections and components on the control board.

Specifications and Limitations

Operator Size and Dimensions

Provides dimensional data of the operator unit.

Usage Limitations

Outlines operational limits for different gate operator models.

Technical Data

Electrical and Mechanical Data

Detailed technical parameters for each model.

Fuse Specifications

Specifies fuse types for various components.

Cable Management

Cable Types and Thicknesses

Recommended cable types and minimum cross-sections.

Installation Procedure - Preliminaries

Preliminary Installation Steps

Steps before laying the foundation frame for installation.

Anchoring Plate Installation

Instructions for setting up the anchoring plate.

Installation Procedure - Rack

Fastening the Rack

Details on how to attach the gate rack.

Installation Procedure - Operator Mounting

Adjusting Pinion-Rack Coupling

Guide to adjusting the gear coupling for smooth operation.

Securing the Operator

Securely fixing the operator to the anchoring plate.

Installation Procedure - Mechanical Limit Switches

Mechanical Limit Switch Setup

Setting the gate's open and closed limits using mechanical switches.

Installation Procedure - Magnetic Limit Switches

Magnetic Limit Switch Setup

Setting limits using magnetic sensors.

Electrical Connections

Cable Routing Guidelines

Guidelines for routing cables safely.

Power Supply Connection

Connecting the system to the main power.

Accessory Power Output

Details on power output for accessories.

Signalling Devices

Connecting Signalling Devices

How to connect flashing beacons and warning lights.

Control and Safety Devices

Command and Control Devices

Connecting various control inputs like keypads and readers.

Safety Devices

Safety Devices Connection

Connecting photocells and sensitive edges.

Programming Functions

Programming Button Functions

Explains the function of the programming buttons.

Getting Started with Programming

Initial steps for system setup and commissioning.

Gate Operation Configuration

Settings for opening direction, motor test, calibration, and motor type.

Programming Functions

Speed and Sensitivity Settings

Adjust opening/closing speeds, slowdowns, and obstruction detection.

Programming Functions

Input and Safety Configuration

Configure inputs (CX, CY, CZ, CK), total stop, and safety device tests.

Programming Functions

Device and System Settings

Configure wireless devices, commands, hold-to-run, outputs, obstacle removal.

Programming Functions

Command Input and Output Configuration

Configure commands, hold-to-run, and B1-B2 output.

Programming Functions

Automatic Closure and Lighting Settings

Configure automatic closure, lights, courtesy time, and pre-flashing.

Programming Functions

RSE, CRP, and Data Management

Configure RSE cards, CRP, and manage data save/load.

Programming Functions

User Management

Register, remove, and manage users and their functions.

Programming Functions

System Management and Maintenance

Configure language, password, maintenance, and view errors.

Programming Functions

Clock and Timer Settings

Configure clock display, date/time, DST, and manage timers.

Programming Functions

Language and Password Management

Set display language and manage password protection.

Data Management

Import and Export Data

Save and load user data and system configurations.

Error Messages

Troubleshooting Common Errors

Lists and explains common error messages and their causes.

Final Operations

Final Installation Steps

Concluding steps for completing the installation.

Paired Operation

Paired Operation Setup

Connecting two operators for synchronized control.

Paired Operation Modes

Demonstrates operating modes for paired systems.

Maintenance and Reliability

MCBF and Windy Area Installation

Mean Cycles Between Failures and installation considerations for windy areas.

Routine Maintenance Checks

Periodic checks for proper operation and wear.

Related product manuals