p.
13 - Manual code:
119 U31EN v.
7 -
10/2016 - © Came S.p.A. The contents of this manual may be changed at any time without prior notice.
Installer’s stamp Operator name
Date of job
Technician’s segnature
Requester’s segnature
Job performed ________________________________________________________________________________________
__________________________________________________________________________________________________
Installer’s stamp Operator name
Date of job
Technician’s segnature
Requester’s segnature
Job performed ________________________________________________________________________________________
__________________________________________________________________________________________________
Date Notes Signature
Maintenance
Periodic maintenance
☞ Before doing any maintenance, cut off the power supply, to prevent any hazardous situations caused by accidentally activating the operator.
Periodic maintenance log kept by users (every six months)
Extraordinary maintenance
⚠
The following table is for logging any extraordinary maintenance jobs, repairs and improvements performed by specialized contractors.
Any extraordinary maintenance jobs must be done only by specialized technicians.
Extraordinary maintenance log