EasyManua.ls Logo

Camus Hydronics DRH5000 - Sequence of Operation

Camus Hydronics DRH5000
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
Sequence of Operation
Flow Switch = Flow Switch, Low water cutoff (if equipped), Water Pressure Switch (30 PSI)
Gas Pressure Switch = Low gas pressure switch (4.5” w.c., N/O), High gas pressure swtich (14” w.c., N/C)
Blocked flue switch (N/C)
Interrupted Air Switch (DR 1200 – 5000, N/O)

Table of Contents

Related product manuals